The Elizabethville Area Authority has been serving sewer customers in the Borough of Elizabethville since 1968. Our collection system has since then expanded into Washington Township on both the east and west sides of the Borough. The original wastewater treatment plant was built in 1968, expanded in 1975, then taken off-line in 2002 when the Authority built a new Aqua-Aerobics SBR wastewater treatment facility under a DEP consent order.
The Authority purchased the water company from private investors in 1991. After purchasing the water company, the Authority made many necessary improvements. The finished water reservoir was covered with a new steel building, two new wells were drilled and the spring catch basins were taken off-line, all were DEP requirements. The Authority drilled another well in 1998 to supplement the other 4 wells being used. The treatment of the raw well water is simply chemical addition for pH adjustment, corrosion control and disinfection. The distribution system also had many upgrades. The Authority has installed 2,000 feet of 6 inch pipe, 12,100 feet of 8 inch pipe and 7,200 feet of 12 inch pipe throughout the system. Of the 21,300 feet of pipe installed, 12,300 feet was replacing deteriorated water mains from the early 1900's and 9,000 feet was new water main, extending our service area.
Elizabethville Area Authority
4154 North Route 225
Elizabethville, PA 17023
The Authority Board meets the 4th Wednesday of each month (January - October) and the 3rd Wednesday of each month (November & December) at 7:00pm in the Elizabethville Borough Building located at 68 S Moore St, Elizabethville, PA 17023. Meetings are open to the Public.